SPP-GEN-2015-030
200.1 MW generation in Noble, OK · In queue since March 2015 · Proposed COD November 2017
200.1 MW
Capacity
1
Components
Wind
11y 2m
In Queue
Withdrawn
IA Status
COD target: 2017
Total Duration
2y 8m
Schedule
104 months past proposed COD
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2017-11-01
SPP-GEN-2015-030 is a proposed wind generation project with a total capacity of 200.1 MW. The project is located in Noble County, Oklahoma, and interconnects within the Southwest Power Pool (SPP) region to Oklahoma Gas & Electric (OGE) at the Sooner 345kV point of interconnection. The project entered the SPP interconnection queue on March 19, 2015, with a proposed commercial operation date of November 1, 2017.
The interconnection agreement (IA) status for SPP-GEN-2015-030 is listed as Withdrawn.
Generated from interconnection queue and public data sources
State
OK
County
Noble
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
OGE
Entity
SPP
Service Type
—
Point of Interconnection
Sooner 345kV
Data Source
LBNL + Live
- ISO / RTO
- SPP
- Trading Hub
- SPP South Hub
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- OKGESO1
- POI Substation
- Sooner Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.