Project SPP-GEN-2015-056 — Project Summary

Queue ID
SPP-GEN-2015-056
Capacity
101.2 MW
Technology
Other
Status
active
Location
Roosevelt, NM
Region
SPP
Developer
IA Status
Withdrawn

SPP-GEN-2015-056

SPP-GEN-2015-056BetaActiveOtherSPPLBNL + Live

101.2 MW generation in Roosevelt, NM · In queue since October 2015 · Proposed COD December 2020

101.2 MW

Capacity

1

Components

Other

10y 7m

In Queue

Withdrawn

IA Status

COD target: 2020

Interconnection

Total Duration

5y 2m

Schedule

66 months past proposed COD

In Study38%
Queue EntryOct 6, 2015

Interconnection request submitted to ISO/RTO

DISIS StudyCurrent

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2020-12-01

About

SPP-GEN-2015-056 is a proposed generation project with a total capacity of 101.2 MW, located in Roosevelt County, New Mexico. The project, which utilizes an unspecified "Other" technology, is in the Southwest Power Pool (SPP) interconnection queue, with queue entry date of October 6, 2015. The proposed commercial operation date was December 1, 2020.

The interconnection agreement (IA) status for SPP-GEN-2015-056 is listed as "Withdrawn". The point of interconnection (POI) is the Eddy County-Tolk (Crossroads) 345kV substation. The project's transmission provider is Southwestern Public Service (SPS).

Generated from interconnection queue and public data sources

Project Details

State

NM

County

Roosevelt

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

Utility

SPS

Entity

SPP

Service Type

Point of Interconnection

Eddy County-Tolk (Crossroads) 345kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP South Hub
Hub Confidence
HIGH
Nearest Node (Estimated)
EDDY

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project SPP-GEN-2015-056