66 MW generation in Thayer, NE · In queue since September 2015 · Proposed COD December 2019
66 MW
Capacity
1
Components
Wind
10y 8m
In Queue
Withdrawn
IA Status
COD target: 2019
Total Duration
4y 3m
Schedule
78 months past proposed COD
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2019-12-01
SPP-GEN-2015-087 is a proposed wind generation project with a total capacity of 66 MW, located in Thayer County, Nebraska. The project is in the Southwest Power Pool (SPP) interconnection queue, with an original queue entry date of September 30, 2015. The proposed commercial operation date was December 1, 2019. The interconnecting utility is Nebraska Public Power District (NPPD).
The interconnection agreement (IA) status for SPP-GEN-2015-087 is listed as Withdrawn. The point of interconnection (POI) is the Hebron-Fairbury 115 kV line.
Generated from interconnection queue and public data sources
State
NE
County
Thayer
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
NPPD
Entity
SPP
Service Type
—
Point of Interconnection
Hebron-Fairbury 115 kV
Data Source
LBNL + Live
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.