SPP-GEN-2016-063
200 MW generation in Johnston, OK · In queue since March 2016 · Proposed COD June 2023
200 MW
Capacity
1
Components
Wind
10y 2m
In Queue
Withdrawn
IA Status
COD target: 2023
Total Duration
7y 3m
Schedule
36 months past proposed COD
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-06-01
SPP-GEN-2016-063 is a proposed 200 MW wind generation project located in Johnston County, Oklahoma. The project was entered into the Southwest Power Pool (SPP) interconnection queue on March 30, 2016, with a proposed commercial operation date of June 1, 2023. The interconnecting utility is Oklahoma Gas & Electric (OGE). The point of interconnection is the Hugo-Sunnyside 345 kV substation.
As of the latest data, the project's interconnection agreement (IA) status is listed as Withdrawn. The project is listed as active in the SPP queue.
Generated from interconnection queue and public data sources
State
OK
County
Johnston
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
OGE
Entity
SPP
Service Type
—
Point of Interconnection
Hugo-Sunnyside 345 kV
Data Source
LBNL + Live
- ISO / RTO
- SPP
- Trading Hub
- SPP South Hub
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.