SPP-GEN-2017-125
252 MW generation in Osage, KS · In queue since November 2017 · Proposed COD November 2027
252 MW
Capacity
1
Components
Wind
8y 6m
In Queue
Withdrawn
IA Status
COD target: 2027
Total Duration
10 years
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-11-08
SPP-GEN-2017-125 is a proposed wind generation project with a total capacity of 252 MW. The project is located in Osage County, Kansas, and falls within the Southwest Power Pool (SPP) service area. The designated utility is Western Resources (WERE). The project entered the SPP interconnection queue on November 20, 2017, with a proposed commercial operation date of November 8, 2027.
The interconnection agreement (IA) status for SPP-GEN-2017-125 is listed as Withdrawn. The point of interconnection (POI) is the Swissvale 345kV substation.
Generated from interconnection queue and public data sources
State
KS
County
Osage
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
WERE
Entity
SPP
Service Type
—
Point of Interconnection
Swissvale 345kV
Data Source
LBNL + Live
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- HIGH
- POI Substation
- Swissvale Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project SPP-GEN-2017-125