Project SPP-GEN-2021-038 — Project Summary

Queue ID
SPP-GEN-2021-038
Capacity
200 MW
Technology
Battery
Status
active
Location
Titus, TX
Region
SPP
Developer
IA Status
System Impact Study

SPP-GEN-2021-038

SPP-GEN-2021-038BetaActiveBatterySPPLBNL + Live

200 MW storage in Titus, TX · In queue since April 2021 · Proposed COD May 2028

200 MW

Capacity

1

Components

Battery

5y 1m

In Queue

System Impact Study

IA Status

COD target: 2028

Interconnection

Total Duration

7y 1m

Impact Study25%
Queue EntryApr 30, 2021

Interconnection request submitted to ISO/RTO

DISIS StudyCurrent

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-05-31

About

SPP-GEN-2021-038 is a proposed 200 MW battery storage project located in Titus County, Texas. Interconnecting to the Welsh 345kV Substation, the project is in the Southwest Power Pool (SPP) interconnection queue with an entry date of April 30, 2021. The proposed commercial operation date is May 31, 2028. The project's interconnection status is currently in the System Impact Study phase.

The development project is being proposed within the American Electric Power (AEP) utility service area. It consists solely of battery storage, with a total capacity of 200 MW. The project is currently listed as active within the SPP interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Titus

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

SPP

Service Type

Point of Interconnection

Welsh 345kV Substation

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP South Hub
Hub Confidence
HIGH
Nearest Node (Estimated)
CSWWELSH1
POI Substation
Welsh Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.