SPP-GEN-2022-065
145 MW generation in Edwards, KS · In queue since July 2022 · Proposed COD November 2027
145 MW
Capacity
1
Components
Solar
3y 10m
In Queue
System Impact Study
IA Status
COD target: 2027
Total Duration
5y 4m
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-11-19
SPP-GEN-2022-065 is a proposed solar generation project with a total capacity of 145 MW. The project is located in Edwards County, Kansas, and is interconnected within the Southwest Power Pool (SPP) region. The project's queue entry date is July 25, 2022, with a proposed commercial operation date of November 19, 2027.
The interconnection status for SPP-GEN-2022-065 is currently in the System Impact Study phase. The point of interconnection (POI) is a tap on the Arthur Mullergreen-Spearville 230 kV line. The project is being developed within the Sunflower Electric Power Corporation (SUNC) service territory.
Generated from interconnection queue and public data sources
State
KS
County
Edwards
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
SUNC
Entity
SPP
Service Type
—
Point of Interconnection
tap on Arthur Mullergreen-Spearville 230 kV line
Data Source
LBNL + Live
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project SPP-GEN-2022-065