SPP-GEN-2024-003
102.2 MW generation in Franklin, AR · In queue since April 2024 · Proposed COD November 2025
102.2 MW
Capacity
1
Components
Gas
2y 1m
In Queue
System Impact Study
IA Status
COD target: 2025
Total Duration
1y 7m
Schedule
6 months past proposed COD
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-11-07
SPP-GEN-2024-003 is a proposed generation project located in Franklin County, Arkansas, within the Southwest Power Pool (SPP) region. The project, developed by AECC, consists of 102.2 MW of gas-fired generation. It entered the SPP interconnection queue on April 25, 2024, and has a proposed commercial operation date of November 7, 2025. The project's interconnection status is currently in the System Impact Study phase, and the point of interconnection is Fitzhugh 161kV.
The proposed project consists of 102.2 MW of gas-fired generation.
Generated from interconnection queue and public data sources
State
AR
County
Franklin
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
AECC
Entity
SPP
Service Type
—
Point of Interconnection
Fitzhugh 161kV
Data Source
LBNL + Live
- ISO / RTO
- SPP
- Trading Hub
- SPP South Hub
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project SPP-GEN-2024-003