SPP-GEN-2024-025
300 MW generation in Bowie, TX · In queue since October 2024 · Proposed COD December 2030
300 MW
Capacity
1
Components
Solar
1y 7m
In Queue
System Impact Study
IA Status
COD target: 2030
Total Duration
6y 2m
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-12-31
SPP-GEN-2024-025 is a proposed 300 MW solar generation project located in Bowie County, Texas. The project is in the Southwest Power Pool (SPP) interconnection queue, with an entry date of October 30, 2024. The proposed commercial operation date is December 31, 2030. The interconnection request is currently in the System Impact Study phase. The point of interconnection is the Lydia 345 kV Substation, and the interconnecting utility is AEP.
The development project consists of 300 MW of solar photovoltaic generation. It is currently listed as an active project within the SPP queue.
Generated from interconnection queue and public data sources
State
TX
County
Bowie
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
SPP
Service Type
—
Point of Interconnection
Lydia 345 kV Substation
Data Source
LBNL + Live
- ISO / RTO
- SPP
- Trading Hub
- SPP South Hub
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project SPP-GEN-2024-025