Project SPP-GEN-2024-067 — Project Summary

Queue ID
SPP-GEN-2024-067
Capacity
380 MW
Technology
Solar
Status
active
Location
Cloud, KS
Region
SPP
Developer
IA Status
System Impact Study

SPP-GEN-2024-067

SPP-GEN-2024-067BetaActiveSolarSPPLBNL + Live

380 MW generation in Cloud, KS · In queue since October 2024 · Proposed COD July 2029

380 MW

Capacity

1

Components

Solar

1y 7m

In Queue

System Impact Study

IA Status

COD target: 2029

Interconnection

Total Duration

4y 9m

Impact Study25%
Queue EntryOct 30, 2024

Interconnection request submitted to ISO/RTO

DISIS StudyCurrent

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-07-01

About

SPP-GEN-2024-067 is a proposed solar generation project located in Cloud County, Kansas, within the Southwest Power Pool (SPP) region. The project, with a total capacity of 380 MW, is being developed in the SUNC utility territory. It entered the SPP interconnection queue on October 30, 2024, and has a proposed commercial operation date of July 1, 2029. The project's interconnection status is currently in the System Impact Study phase.

The proposed project consists of 380 MW of solar photovoltaic generation. The point of interconnection (POI) is the Meridian Way 230 kV Substation. The project is listed as "active" in the SPP interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

KS

County

Cloud

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

Utility

SUNC

Entity

SPP

Service Type

Point of Interconnection

Meridian Way 230 kV Substation

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP North Hub
Hub Confidence
HIGH
Nearest Node (Estimated)
EDE_MWW
POI Substation
Meridian Way 1 Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project SPP-GEN-2024-067