SPP-GEN-2024-109
400.5 MW generation in Bailey, TX · In queue since March 2025
400.5 MW
Capacity
0
Components
1y 2m
In Queue
—
IA Status
Total Duration
1y 2m
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
SPP-GEN-2024-109 is a proposed wind generation project located in Bailey County, Texas, within the Southwest Power Pool (SPP) region. The project, with a total capacity of 400.5 MW, is interconnected to the SPS utility via the Tolk - Crossroads 345 kV line. It is listed in the SPP interconnection queue as of March 1, 2025, with an active status.
The project is designated for Energy Resource/Network Resource (ER/NR) service. The developer is not specified in the queue data.
Generated from interconnection queue and public data sources
State
TX
County
Bailey
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
SPS
Entity
SPP
Service Type
ER/NR
Point of Interconnection
Tolk - Crossroads 345 kV line
Data Source
Live · SPP
- ISO / RTO
- SPP
- Trading Hub
- SPP South Hub
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.