Project SPP-GEN-2024-109 — Project Summary

Queue ID
SPP-GEN-2024-109
Capacity
400.5 MW
Technology
Wind
Status
active
Location
Bailey, TX
Region
SPP
Developer
IA Status

SPP-GEN-2024-109

SPP-GEN-2024-109BetaActiveWind / WindSPPLive · SPP

400.5 MW generation in Bailey, TX · In queue since March 2025

400.5 MW

Capacity

0

Components

1y 2m

In Queue

IA Status

Interconnection

Total Duration

1y 2m

Pre-Study0%
Queue EntryMar 1, 2025

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

SPP-GEN-2024-109 is a proposed wind generation project located in Bailey County, Texas, within the Southwest Power Pool (SPP) region. The project, with a total capacity of 400.5 MW, is interconnected to the SPS utility via the Tolk - Crossroads 345 kV line. It is listed in the SPP interconnection queue as of March 1, 2025, with an active status.

The project is designated for Energy Resource/Network Resource (ER/NR) service. The developer is not specified in the queue data.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Bailey

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

Utility

SPS

Entity

SPP

Service Type

ER/NR

Point of Interconnection

Tolk - Crossroads 345 kV line

Data Source

Live · SPP

Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP South Hub
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.