Project SPP-GEN-2024-136 — Project Summary

Queue ID
SPP-GEN-2024-136
Capacity
400 MW
Technology
Solar
Status
active
Location
Scott, KS
Region
SPP
Developer
IA Status

SPP-GEN-2024-136

SPP-GEN-2024-136BetaActiveSolar / PhotovoltaicSPPLive · SPP

400 MW generation in Scott, KS · In queue since March 2025

400 MW

Capacity

0

Components

1y 2m

In Queue

IA Status

Interconnection

Total Duration

1y 2m

Pre-Study0%
Queue EntryMar 1, 2025

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

SPP-GEN-2024-136 is a proposed 400 MW solar photovoltaic generation project located in Scott County, Kansas. The project is in the Southwest Power Pool (SPP) interconnection queue, with a queue entry date of March 1, 2025. The point of interconnection is the Setab 345 kV Substation.

The project's service type is Energy Resource/Network Resource (ER/NR). The interconnecting utility is Sunflower Electric Power Corporation (SUNC). The project is currently listed as active in the SPP queue.

Generated from interconnection queue and public data sources

Project Details

State

KS

County

Scott

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

Utility

SUNC

Entity

SPP

Service Type

ER/NR

Point of Interconnection

Setab 345 kV Substation

Data Source

Live · SPP

Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP North Hub
Hub Confidence
HIGH
POI Substation
Setab Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.