SPP-GEN-2024-145
250 MW generation in Dallam, TX · In queue since March 2025
250 MW
Capacity
0
Components
1y 2m
In Queue
—
IA Status
Total Duration
1y 2m
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
SPP-GEN-2024-145 is a proposed 250 MW wind generation project located in Dallam County, Texas. The project is in the Southwest Power Pool (SPP) interconnection queue, with a queue entry date of March 1, 2025. The interconnecting utility is Southwestern Public Service (SPS).
The project's point of interconnection (POI) is the XIT Interchange 230 kV Substation. The designated service type is Energy Resource/Network Resource (ER/NR). As of the current data, the project is listed as active in the SPP queue.
Generated from interconnection queue and public data sources
State
TX
County
Dallam
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
SPS
Entity
SPP
Service Type
ER/NR
Point of Interconnection
XIT Interchange 230 kV Substation
Data Source
Live · SPP
- ISO / RTO
- SPP
- Trading Hub
- SPP South Hub
- Hub Confidence
- HIGH
- POI Substation
- Potter County Interchange
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.