SPP-GEN-2024-159
300 MW generation in Roosevelt, NM · In queue since March 2025
300 MW
Capacity
0
Components
1y 2m
In Queue
—
IA Status
Total Duration
1y 2m
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
SPP-GEN-2024-159 is a proposed 300 MW solar generation project located in Roosevelt County, New Mexico. The project is in the Southwest Power Pool (SPP) interconnection queue, with a queue entry date of March 1, 2025. The proposed point of interconnection (POI) is the Oasis 230 kV Substation, and the designated service type is ER/NR.
The project's interconnection status is listed as active. The utility is Southwestern Public Service (SPS), and the entity is SPP. The technology detail indicates the project will utilize photovoltaic solar technology.
Generated from interconnection queue and public data sources
State
NM
County
Roosevelt
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
SPS
Entity
SPP
Service Type
ER/NR
Point of Interconnection
Oasis 230 kV Substation
Data Source
Live · SPP
- ISO / RTO
- SPP
- Trading Hub
- SPP South Hub
- Hub Confidence
- HIGH
- POI Substation
- Oasis Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project SPP-GEN-2024-159