SPP-GEN-2024-259
199.8 MW generation in Barton, MO · In queue since March 2025
199.8 MW
Capacity
0
Components
1y 2m
In Queue
—
IA Status
Total Duration
1y 2m
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
SPP-GEN-2024-259 is a proposed solar and battery energy storage project located in Barton County, Missouri. The project, with a total capacity of 199.8 MW, consists of both solar photovoltaic generation and battery storage components. It is listed as active in the Southwest Power Pool (SPP) interconnection queue, with an entry date of March 1, 2025. The point of interconnection is the Asbury 161 kV Substation.
The project's requested service type is Energy Resource/Network Resource (ER/NR). The interconnecting utility is Empire District Electric Company (EMDE).
Generated from interconnection queue and public data sources
State
MO
County
Barton
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
EMDE
Entity
SPP
Service Type
ER/NR
Point of Interconnection
Asbury 161 kV Substation
Data Source
Live · SPP
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- HIGH
- POI Substation
- Asbury Substation