SPP-GEN-2024-265
155 MW generation in Lea, NM · In queue since March 2025
155 MW
Capacity
0
Components
1y 2m
In Queue
—
IA Status
Total Duration
1y 2m
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
SPP-GEN-2024-265 is a proposed solar and battery energy storage project located in Lea County, New Mexico. The project, with a total capacity of 155 MW, consists of both solar photovoltaic generation and battery storage. It is interconnected within the Southwest Power Pool (SPP) at the Bensing 115 kV Substation, and is listed in the SPP interconnection queue as of March 1, 2025.
The project's interconnection service type is Energy Resource/Network Resource (ER/NR). The queue status is currently listed as active.
Generated from interconnection queue and public data sources
State
NM
County
Lea
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
SPS
Entity
SPP
Service Type
ER/NR
Point of Interconnection
Bensing 115 kV Substation
Data Source
Live · SPP
- ISO / RTO
- SPP
- Trading Hub
- SPP South Hub
- Hub Confidence
- HIGH
- POI Substation
- Bensing Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project SPP-GEN-2024-265