SPP-GEN-2024-278
264.3 MW generation in Lea, NM · In queue since March 2025
264.3 MW
Capacity
0
Components
1y 2m
In Queue
—
IA Status
Total Duration
1y 2m
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
SPP-GEN-2024-278 is a proposed wind and battery hybrid project with a total capacity of 264.3 MW. The development is located in Lea County, New Mexico, and is interconnected within the Southwest Power Pool (SPP) queue. The project entered the queue on March 1, 2025, under service type ER/NR, and is currently listed as active.
The project consists of both wind and battery storage components, though their individual capacities are not specified. The point of interconnection (POI) is the Eddy County - Crossroads 345 kV Line, and the interconnecting utility is SPS. There is no information available regarding the developer, proposed commercial operation date, interconnection agreement (IA) status, or any matching operating plant in the EIA database. There is no indication of recent news coverage for this project.
Generated from interconnection queue and public data sources
State
NM
County
Lea
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
SPS
Entity
SPP
Service Type
ER/NR
Point of Interconnection
Eddy County - Crossroads 345 kV Line
Data Source
Live · SPP
- ISO / RTO
- SPP
- Trading Hub
- SPP South Hub
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- EDDY
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project SPP-GEN-2024-278