SPP-GEN-2024-284
199 MW generation in Mercer, ND · In queue since March 2025
199 MW
Capacity
0
Components
1y 2m
In Queue
—
IA Status
Total Duration
1y 2m
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
SPP-GEN-2024-284 is a proposed 199 MW solar generation project located in Mercer County, North Dakota. The project is interconnected within the Southwest Power Pool (SPP) queue, having entered the queue on March 1, 2025. The designated point of interconnection (POI) is the Antelope Valley - Broadland 345 kV Line. Basin Electric Power Cooperative (BEPC) is the utility associated with the project.
The project's interconnection service type is designated as ER/NR, indicating both Energy Resource and Network Resource interconnection service. The project's status is currently listed as active within the SPP queue.
Generated from interconnection queue and public data sources
State
ND
County
Mercer
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
BEPC
Entity
SPP
Service Type
ER/NR
Point of Interconnection
Antelope Valley - Broadland 345 kV Line
Data Source
Live · SPP
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- ANTELOPE
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.