SPP-GEN-2024-351
199 MW generation in Lea, NM · In queue since March 2025
199 MW
Capacity
0
Components
1y 2m
In Queue
—
IA Status
Total Duration
1y 2m
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
SPP-GEN-2024-351 is a proposed 199 MW solar and battery hybrid project located in Lea County, New Mexico. The project is in the Southwest Power Pool (SPP) interconnection queue, with a queue entry date of March 1, 2025. The proposed point of interconnection is the Cooper Ranch 115 kV Substation, and the service type is Energy Resource/Network Resource (ER/NR).
The project consists of both solar and battery storage components, though the individual capacities of each are not specified. The interconnecting utility is Southwestern Public Service (SPS). The project's status in the SPP queue is currently listed as active.
Generated from interconnection queue and public data sources
State
NM
County
Lea
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
SPS
Entity
SPP
Service Type
ER/NR
Point of Interconnection
Cooper Ranch 115 kV Substation
Data Source
Live · SPP
- ISO / RTO
- SPP
- Trading Hub
- SPP South Hub
- Hub Confidence
- HIGH
- POI Substation
- Cooper Ranch Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project SPP-GEN-2024-351