Project SPP-GEN-2024-355 — Project Summary

Queue ID
SPP-GEN-2024-355
Capacity
199 MW
Technology
Battery
Status
active
Location
Lubbock, TX
Region
SPP
Developer
IA Status

SPP-GEN-2024-355

SPP-GEN-2024-355BetaActiveBattery/Storage / BatterySPPLive · SPP

199 MW storage in Lubbock, TX · In queue since March 2025

199 MW

Capacity

0

Components

1y 2m

In Queue

IA Status

Interconnection

Total Duration

1y 2m

Pre-Study0%
Queue EntryMar 1, 2025

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

SPP-GEN-2024-355 is a proposed 199 MW battery storage project located in Lubbock County, Texas. The project is listed in the Southwest Power Pool (SPP) interconnection queue with a queue entry date of March 1, 2025. The proposed point of interconnection (POI) is the Lubbock South 230 kV Substation, and the requested service type is ER/NR.

The project is currently listed as active in the SPP queue. The utility is South Plains Electric Cooperative (SPS). No information is available regarding the developer, proposed commercial operation date, or interconnection agreement (IA) status. The project has not appeared in recent news coverage, nor is it linked to an existing operating plant in EIA data.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Lubbock

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

Utility

SPS

Entity

SPP

Service Type

ER/NR

Point of Interconnection

Lubbock South 230 kV Substation

Data Source

Live · SPP

Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP South Hub
Hub Confidence
HIGH
POI Substation
Lubbock South Interchange

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.