SPP-GEN-2024-376
142.183 MW generation in Sabine, TX · In queue since March 2025
142.183 MW
Capacity
0
Components
1y 2m
In Queue
—
IA Status
Total Duration
1y 2m
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
SPP-GEN-2024-376 is a proposed solar generation project with a total capacity of 142.18 MW. The project is located in Sabine County, Texas, and is interconnected within the Southwest Power Pool (SPP) queue. The point of interconnection is the Hemphill 138 kV Substation.
The project entered the SPP interconnection queue on March 1, 2025. The designated service type is ER/NR.
Generated from interconnection queue and public data sources
State
TX
County
Sabine
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
ETEC
Entity
SPP
Service Type
ER/NR
Point of Interconnection
Hemphill 138 kV Substation
Data Source
Live · SPP
- ISO / RTO
- SPP
- Trading Hub
- SPP South Hub
- Hub Confidence
- HIGH
- POI Substation
- Hemphill Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.