Project SPP-GEN-2024-376 — Project Summary

Queue ID
SPP-GEN-2024-376
Capacity
142.183 MW
Technology
Solar
Status
active
Location
Sabine, TX
Region
SPP
Developer
IA Status

SPP-GEN-2024-376

SPP-GEN-2024-376BetaActiveSolar / PhotovoltaicSPPLive · SPP

142.183 MW generation in Sabine, TX · In queue since March 2025

142.183 MW

Capacity

0

Components

1y 2m

In Queue

IA Status

Interconnection

Total Duration

1y 2m

Pre-Study0%
Queue EntryMar 1, 2025

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

SPP-GEN-2024-376 is a proposed solar generation project with a total capacity of 142.18 MW. The project is located in Sabine County, Texas, and is interconnected within the Southwest Power Pool (SPP) queue. The point of interconnection is the Hemphill 138 kV Substation.

The project entered the SPP interconnection queue on March 1, 2025. The designated service type is ER/NR.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Sabine

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

Utility

ETEC

Entity

SPP

Service Type

ER/NR

Point of Interconnection

Hemphill 138 kV Substation

Data Source

Live · SPP

Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP South Hub
Hub Confidence
HIGH
POI Substation
Hemphill Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.