Project SPP-GEN-2025-GR3 — Project Summary

Queue ID
SPP-GEN-2025-GR3
Capacity
0.03 MW
Technology
Wind
Status
active
Location
Max, ND
Region
SPP
Developer
IA Status

SPP-GEN-2025-GR3

SPP-GEN-2025-GR3BetaActiveWindSPPLive · SPP

0.03 MW generation in Max, ND · In queue since October 2025

0.03 MW

Capacity

0

Components

7 months

In Queue

IA Status

Interconnection

Total Duration

7 months

Pre-Study0%
Queue EntryOct 6, 2025

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

SPP-GEN-2025-GR3 is a proposed wind generation project located in Max County, North Dakota. The project, with a total capacity of 0.03 MW, is in the Southwest Power Pool (SPP) interconnection queue. The queue entry date is October 6, 2025. The interconnecting utility is Western Area Power Administration (WAPA).

The project's point of interconnection (POI) is SW Minot, and the requested service type is ER/NR (Energy Resource / Network Resource). As of the latest data, the project remains in active status within the SPP queue.

Generated from interconnection queue and public data sources

Project Details

State

ND

County

Max

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

Utility

WAPA

Entity

SPP

Service Type

ER/NR

Point of Interconnection

SW Minot

Data Source

Live · SPP

Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP North Hub
Hub Confidence
HIGH
POI Substation
SW Minot Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project SPP-GEN-2025-GR3