SPP-GEN-2025-GR3
0.03 MW generation in Max, ND · In queue since October 2025
0.03 MW
Capacity
0
Components
7 months
In Queue
—
IA Status
Total Duration
7 months
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
SPP-GEN-2025-GR3 is a proposed wind generation project located in Max County, North Dakota. The project, with a total capacity of 0.03 MW, is in the Southwest Power Pool (SPP) interconnection queue. The queue entry date is October 6, 2025. The interconnecting utility is Western Area Power Administration (WAPA).
The project's point of interconnection (POI) is SW Minot, and the requested service type is ER/NR (Energy Resource / Network Resource). As of the latest data, the project remains in active status within the SPP queue.
Generated from interconnection queue and public data sources
State
ND
County
Max
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
WAPA
Entity
SPP
Service Type
ER/NR
Point of Interconnection
SW Minot
Data Source
Live · SPP
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- HIGH
- POI Substation
- SW Minot Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project SPP-GEN-2025-GR3