Project SPP-GEN-2025-GR5 — Project Summary

Queue ID
SPP-GEN-2025-GR5
Capacity
7.7 MW
Technology
Wind
Status
active
Location
Minot, ND
Region
SPP
Developer
IA Status

SPP-GEN-2025-GR5

SPP-GEN-2025-GR5BetaActiveWindSPPLive · SPP

7.7 MW generation in Minot, ND · In queue since October 2025

7.7 MW

Capacity

0

Components

7 months

In Queue

IA Status

Interconnection

Total Duration

7 months

Pre-Study0%
Queue EntryOct 6, 2025

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

SPP-GEN-2025-GR5 is a proposed wind generation project with a total capacity of 7.7 MW. The project is located in Minot County, North Dakota, and is interconnected within the Southwest Power Pool (SPP) region. The designated utility for the project is Western Area Power Administration (WAPA).

The project entered the SPP interconnection queue on October 6, 2025. Its service type is Energy Resource/Network Resource (ER/NR), and its Point of Interconnection (POI) is the Nelson Tap. The project's current status in the interconnection queue is active.

Generated from interconnection queue and public data sources

Project Details

State

ND

County

Minot

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

Utility

WAPA

Entity

SPP

Service Type

ER/NR

Point of Interconnection

Nelson Tap

Data Source

Live · SPP

Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP North Hub
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project SPP-GEN-2025-GR5