SPP-GEN-2025-SR2
67.2 MW generation in Hansford County, TX · In queue since May 2025
67.2 MW
Capacity
0
Components
1 year
In Queue
—
IA Status
Total Duration
1 year
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
SPP-GEN-2025-SR2 is a proposed wind generation project located in Hansford County, Texas, within the Southwest Power Pool (SPP) region. The project, with a total capacity of 67.2 MW, is interconnected to the SPS utility at the Hansford 115kV point of interconnection.
The project entered the SPP interconnection queue on May 5, 2025, and is currently listed as active. The service type requested is Energy Resource (ER).
Generated from interconnection queue and public data sources
State
TX
County
Hansford County
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
SPS
Entity
SPP
Service Type
ER
Point of Interconnection
Hansford 115kV
Data Source
Live · SPP
- ISO / RTO
- SPP
- Trading Hub
- SPP South Hub
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- SPS.GGPO.STOCKYARD4
- POI Substation
- Hansford County Switching Station
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.