Project SPP-GEN-2025-SR2 — Project Summary

Queue ID
SPP-GEN-2025-SR2
Capacity
67.2 MW
Technology
Wind
Status
active
Location
Hansford County, TX
Region
SPP
Developer
IA Status

SPP-GEN-2025-SR2

SPP-GEN-2025-SR2BetaActiveWindSPPLive · SPP

67.2 MW generation in Hansford County, TX · In queue since May 2025

67.2 MW

Capacity

0

Components

1 year

In Queue

IA Status

Interconnection

Total Duration

1 year

Pre-Study0%
Queue EntryMay 5, 2025

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

SPP-GEN-2025-SR2 is a proposed wind generation project located in Hansford County, Texas, within the Southwest Power Pool (SPP) region. The project, with a total capacity of 67.2 MW, is interconnected to the SPS utility at the Hansford 115kV point of interconnection.

The project entered the SPP interconnection queue on May 5, 2025, and is currently listed as active. The service type requested is Energy Resource (ER).

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Hansford County

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

Utility

SPS

Entity

SPP

Service Type

ER

Point of Interconnection

Hansford 115kV

Data Source

Live · SPP

Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP South Hub
Hub Confidence
HIGH
Nearest Node (Estimated)
SPS.GGPO.STOCKYARD4
POI Substation
Hansford County Switching Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project SPP-GEN-2025-SR2