SPP-GEN-2025-SR20
100 MW generation in Omaha, NE · In queue since June 2025
100 MW
Capacity
0
Components
11 months
In Queue
—
IA Status
Total Duration
11 months
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
SPP-GEN-2025-SR20 is a proposed 100 MW gas-fired generation project located in Omaha County, Nebraska. The project is listed in the Southwest Power Pool (SPP) interconnection queue, having entered the queue on June 12, 2025. The interconnecting utility is the Omaha Public Power District (OPPD).
The project's point of interconnection (POI) is at a substation loop in OPPD lines S1211 to S1220 and S1211 to S1299. The requested service type is Energy Resource (ER). The project's status in the SPP queue is currently listed as active.
Generated from interconnection queue and public data sources
State
NE
County
Omaha
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
OPPD
Entity
SPP
Service Type
ER
Point of Interconnection
SUBSTATION LOOP IN OPPD LINES S1211 TO S1220 AND S1211 TO S1299
Data Source
Live · SPP
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- HIGH
- POI Substation
- Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project SPP-GEN-2025-SR20