Project SPP-GEN-2026-PR1 — Project Summary

Queue ID
SPP-GEN-2026-PR1
Capacity
52.63 MW
Technology
Wind
Status
active
Location
Garfield County, TX
Region
SPP
Developer
IA Status

SPP-GEN-2026-PR1

SPP-GEN-2026-PR1BetaActiveWindSPPLive · SPP

52.63 MW generation in Garfield County, TX · In queue since December 2025

52.63 MW

Capacity

0

Components

5 months

In Queue

IA Status

Interconnection

Total Duration

5 months

Pre-Study0%
Queue EntryDec 1, 2025

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

SPP-GEN-2026-PR1 is a proposed wind generation project with a total capacity of 52.63 MW. The project is located in Garfield County, Texas, and is interconnected within the Southwest Power Pool (SPP) region. OG&E is listed as the utility.

The project entered the SPP interconnection queue on December 1, 2025. Its interconnection status is currently listed as active.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Garfield County

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

Utility

OG&E

Entity

SPP

Service Type

ER

Point of Interconnection

Beaver County 345 kV Substation

Data Source

Live · SPP

Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP South Hub
Hub Confidence
HIGH
POI Substation
Beaver County Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project SPP-GEN-2026-PR1