TEC-111
52 MW generation in Polk, FL · In queue since March 2024 · Proposed COD December 2027
52 MW
Capacity
1
Components
Solar
2y 2m
In Queue
Cluster Study
IA Status
COD target: 2027
Total Duration
3y 9m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-01
TEC-111 is a proposed 52 MW solar generation project located in Polk County, Florida. The project is being developed by Tampa Electric Company (TEC). It entered the TEC interconnection queue on March 27, 2024, with a proposed commercial operation date of December 1, 2027. The project's interconnection status is currently in the Cluster Study phase.
The proposed project consists of 52 MW of solar photovoltaic generation. The point of interconnection is the Pebbledale Substation in Polk County. The project is listed as active in the interconnection queue.
Generated from interconnection queue and public data sources
State
FL
County
Polk
Grid Region
Southeast
Market
—
Developer
—
Utility
Tampa Electric Company
Entity
TEC
Service Type
—
Point of Interconnection
Pebbledale Substation, Polk County
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project TEC-111