TVA-482
110 MW generation in Cumberland, TN · In queue since October 2021 · Proposed COD September 2027
110 MW
Capacity
1
Components
Solar
4y 7m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
5y 11m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-09-13
TVA-482 is a proposed solar generation project with a total capacity of 110 MW, located in Cumberland County, Tennessee. The development project is in the Tennessee Valley Authority (TVA) interconnection queue, with an entry date of October 5, 2021. The proposed commercial operation date is September 13, 2027.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the Plateau 500-kV Substation, utilizing a 161-kV interconnection.
Generated from interconnection queue and public data sources
State
TN
County
Cumberland
Grid Region
Southeast
Market
—
Developer
—
Utility
Tennessee Valley Authority
Entity
TVA
Service Type
—
Point of Interconnection
Plateau 500-kV Substation (161-kV Interconnection)
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- TVA
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project TVA-482