TVA-645
69 MW generation in Haywood, TN · In queue since September 2024 · Proposed COD July 2030
69 MW
Capacity
1
Components
Solar
1y 8m
In Queue
Cluster Study
IA Status
COD target: 2030
Total Duration
5y 10m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-07-12
TVA-645 is a proposed solar generation project located in Haywood County, Tennessee, within the Tennessee Valley Authority (TVA) service area. The project, with a total capacity of 69 MW, consists entirely of solar photovoltaic technology. It is currently listed as an active project in the TVA interconnection queue, with an entry date of September 10, 2024.
The proposed commercial operation date (COD) for TVA-645 is July 12, 2030. Its interconnection status is currently in the Cluster Study phase. The point of interconnection (POI) is the Structure 701-Stanton 161kV TL.
Generated from interconnection queue and public data sources
State
TN
County
Haywood
Grid Region
Southeast
Market
—
Developer
—
Utility
Tennessee Valley Authority
Entity
TVA
Service Type
—
Point of Interconnection
Structure 701-Stanton 161kV TL
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- TVA
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project TVA-645