TVA-649
119 MW generation in Muhlenberg, KY · In queue since September 2024 · Proposed COD October 2033
119 MW
Capacity
1
Components
Solar
1y 8m
In Queue
Cluster Study
IA Status
COD target: 2033
Total Duration
9y 1m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2033-10-01
TVA-649 is a proposed solar generation project with a total capacity of 119 MW, located in Muhlenberg County, Kentucky. The project is sponsored by the Tennessee Valley Authority (TVA). It consists of 119 MW of solar photovoltaic generation.
The project is currently in the Tennessee Valley Authority interconnection queue as of September 23, 2024, with a proposed commercial operation date of October 1, 2033. Its interconnection agreement status is currently in the Cluster Study phase, and the point of interconnection is TVA's Paradise CC 161-kV Substation.
Generated from interconnection queue and public data sources
State
KY
County
Muhlenberg
Grid Region
Southeast
Market
—
Developer
—
Utility
Tennessee Valley Authority
Entity
TVA
Service Type
—
Point of Interconnection
TVA's Paradise CC 161-kV Substation
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- TVA
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.