WAPA-DSW-2022-G9
300 MW hybrid in Pinal, AZ · In queue since July 2022 · Proposed COD December 2025
300 MW
Capacity
1
Components
Solar
3y 10m
In Queue
—
IA Status
COD target: 2025
Total Duration
3y 5m
Schedule
4 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-31
WAPA-DSW-2022-G9 is a proposed 300 MW hybrid solar and battery project located in Pinal County, Arizona. The project is in the West region and is interconnected to the WAPA Desert Southwest Region. The queue entry date is July 5, 2022, with a proposed commercial operation date of December 31, 2025.
The development project consists of 300 MW of solar generation capacity. It is currently listed as active in the WAPA-DSW interconnection queue. The point of interconnection is the Test Track 230kV Substation.
Generated from interconnection queue and public data sources
State
AZ
County
Pinal
Grid Region
Mountain West
Market
—
Developer
—
Utility
WAPA Desert Southwest Region
Entity
WAPA-DSW
Service Type
—
Point of Interconnection
Test Track 230kV Substation
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- PALOVERDE
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project WAPA-DSW-2022-G9