Project WAPA-DSW-2023-G12 — Project Summary

Queue ID
WAPA-DSW-2023-G12
Capacity
25 MW
Technology
Solar+Battery
Status
active
Location
Mohave, AZ
Region
West
Developer
IA Status

WAPA-DSW-2023-G12

WAPA-DSW-2023-G12BetaActiveSolarBatteryWAPA-DSWLBNL

25 MW hybrid in Mohave, AZ · In queue since September 2023 · Proposed COD December 2026

25 MW

Capacity

1

Components

Solar

2y 8m

In Queue

IA Status

COD target: 2026

Interconnection

Total Duration

3y 3m

Pre-Study0%
Queue EntrySep 5, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-12-01

About

WAPA-DSW-2023-G12 is a proposed 25 MW hybrid solar and battery project located in Mohave County, Arizona. The development project consists of 25 MW of solar capacity. It is listed in the WAPA Desert Southwest Region interconnection queue, with an entry date of September 5, 2023.

The proposed commercial operation date for WAPA-DSW-2023-G12 is December 1, 2026. The point of interconnection is the Griffith Switchyard 230kV. The project's interconnection status is currently active.

Generated from interconnection queue and public data sources

Project Details

State

AZ

County

Mohave

Grid Region

Mountain West

Market

Developer

Utility

WAPA Desert Southwest Region

Entity

WAPA-DSW

Service Type

Point of Interconnection

Griffith Switchyard 230kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
PALOVERDE
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.