Project WAPA-DSW-2023-G14 — Project Summary

Queue ID
WAPA-DSW-2023-G14
Capacity
250 MW
Technology
Solar+Battery
Status
active
Location
Pinal, AZ
Region
West
Developer
IA Status

WAPA-DSW-2023-G14

WAPA-DSW-2023-G14BetaActiveSolarBatteryWAPA-DSWLBNL

250 MW hybrid in Pinal, AZ · In queue since October 2023 · Proposed COD March 2027

250 MW

Capacity

1

Components

Solar

2y 7m

In Queue

IA Status

COD target: 2027

Interconnection

Total Duration

3y 5m

Pre-Study0%
Queue EntryOct 27, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-03-01

About

The proposed WAPA-DSW-2023-G14 project is a 250 MW hybrid solar and battery energy storage development in Pinal County, Arizona. The project consists of 250 MW of solar photovoltaic generation.

The project is actively listed in the WAPA Desert Southwest Region interconnection queue as of October 27, 2023, with a proposed commercial operation date of March 1, 2027. The point of interconnection is the ED5 230kV Substation.

Generated from interconnection queue and public data sources

Project Details

State

AZ

County

Pinal

Grid Region

Mountain West

Market

Developer

Utility

WAPA Desert Southwest Region

Entity

WAPA-DSW

Service Type

Point of Interconnection

ED5 230kV Substation

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
PALOVERDE
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project WAPA-DSW-2023-G14