Project WAPA-DSW-2024-G4 — Project Summary

Queue ID
WAPA-DSW-2024-G4
Capacity
550 MW
Technology
Solar+Battery
Status
active
Location
Mohave, AZ
Region
West
Developer
IA Status

WAPA-DSW-2024-G4

WAPA-DSW-2024-G4BetaActiveSolarWindBatteryWAPA-DSWLBNL

550 MW hybrid in Mohave, AZ · In queue since April 2024 · Proposed COD December 2027

550 MW

Capacity

1

Components

Solar

2y 1m

In Queue

IA Status

COD target: 2027

Interconnection

Total Duration

3y 8m

Pre-Study0%
Queue EntryApr 30, 2024

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-31

About

The proposed WAPA-DSW-2024-G4 project is a 550 MW hybrid solar and battery energy storage development project located in Mohave County, Arizona. The project consists of 550 MW of solar generation capacity. It is listed in the WAPA Desert Southwest Region interconnection queue as of April 30, 2024, with a proposed commercial operation date of December 31, 2027.

The project is listed as active in the interconnection queue. The interconnection point of contact is the Topock 230kV substation.

Generated from interconnection queue and public data sources

Project Details

State

AZ

County

Mohave

Grid Region

Mountain West

Market

Developer

Utility

WAPA Desert Southwest Region

Entity

WAPA-DSW

Service Type

Point of Interconnection

Topock 230kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
PALOVERDE
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.