Project WAPA-IS-GI-1502 — Project Summary

Queue ID
WAPA-IS-GI-1502
Capacity
181.7 MW
Technology
Wind
Status
active
Location
Stark, ND
Region
West
Developer
IA Status
In Progress (unknown study)

WAPA-IS-GI-1502

WAPA-IS-GI-1502BetaActiveWindWAPA-ISLBNL

181.7 MW generation in Stark, ND · In queue since March 2015

181.7 MW

Capacity

1

Components

Wind

11y 2m

In Queue

In Progress (unknown study)

IA Status

Interconnection

Total Duration

11y 2m

In Study38%
Queue EntryMar 23, 2015

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

WAPA-IS-GI-1502 is a proposed wind generation project with a total capacity of 181.7 MW, located in Stark County, North Dakota. The project is in the West region and is being developed within the WAPA/BEPC/HCPD Integrated System, under the queue of WAPA-IS. The project entered the interconnection queue on March 23, 2015.

The interconnection status for WAPA-IS-GI-1502 is listed as "In Progress (unknown study)". The point of interconnection is the Belfield-Rhame 230kV line.

Generated from interconnection queue and public data sources

Project Details

State

ND

County

Stark

Grid Region

Mountain West

Market

Developer

Utility

WAPA/BEPC/HCPD Integrated System

Entity

WAPA-IS

Service Type

Point of Interconnection

Belfield-Rhame 230kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project WAPA-IS-GI-1502