WAPA-IS-GI-1502
181.7 MW generation in Stark, ND · In queue since March 2015
181.7 MW
Capacity
1
Components
Wind
11y 2m
In Queue
In Progress (unknown study)
IA Status
Total Duration
11y 2m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
WAPA-IS-GI-1502 is a proposed wind generation project with a total capacity of 181.7 MW, located in Stark County, North Dakota. The project is in the West region and is being developed within the WAPA/BEPC/HCPD Integrated System, under the queue of WAPA-IS. The project entered the interconnection queue on March 23, 2015.
The interconnection status for WAPA-IS-GI-1502 is listed as "In Progress (unknown study)". The point of interconnection is the Belfield-Rhame 230kV line.
Generated from interconnection queue and public data sources
State
ND
County
Stark
Grid Region
Mountain West
Market
—
Developer
—
Utility
WAPA/BEPC/HCPD Integrated System
Entity
WAPA-IS
Service Type
—
Point of Interconnection
Belfield-Rhame 230kV
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.