Capacity
250.7 MW
Technology
Wind
Status
active
Location
Williams, ND
Region
West
Developer
IA Status
In Progress (unknown study)

WAPA-IS-GI-1503

WAPA-IS-GI-1503BetaActiveWindWAPA-ISLBNL

250.7 MW generation in Williams, ND · In queue since March 2015

250.7 MW

Capacity

1

Components

Wind

11y 2m

In Queue

In Progress (unknown study)

IA Status

Interconnection

Total Duration

11y 2m

In Study38%
Queue EntryMar 23, 2015

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

WAPA-IS-GI-1503 is a proposed wind generation project with a total capacity of 250.7 MW, located in Williams County, North Dakota. The project is in the West region and is being developed within the WAPA/BEPC/HCPD Integrated System, under the entity WAPA-IS.

The project entered the WAPA-IS interconnection queue on March 23, 2015. Its interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Williston-Tioga 230kV line.

Generated from interconnection queue and public data sources

Project Details

State

ND

County

Williams

Grid Region

Mountain West

Market

Developer

Utility

WAPA/BEPC/HCPD Integrated System

Entity

WAPA-IS

Service Type

Point of Interconnection

Williston-Tioga 230kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.