Project WAPA-IS-GI-1505 — Project Summary

Queue ID
WAPA-IS-GI-1505
Capacity
99 MW
Technology
Wind
Status
active
Location
Brown, SD
Region
West
Developer
IA Status
In Progress (unknown study)

WAPA-IS-GI-1505

WAPA-IS-GI-1505BetaActiveWindWAPA-ISLBNL

99 MW generation in Brown, SD · In queue since April 2015

99 MW

Capacity

1

Components

Wind

11y 1m

In Queue

In Progress (unknown study)

IA Status

Interconnection

Total Duration

11y 1m

In Study38%
Queue EntryApr 8, 2015

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

WAPA-IS-GI-1505 is a proposed wind generation project with a total capacity of 99 MW, located in Brown County, South Dakota. The project is being developed within the WAPA/BEPC/HCPD Integrated System and interconnected via the WAPA-IS utility. It entered the interconnection queue on April 8, 2015.

The project's interconnection status is listed as "In Progress (unknown study)". The point of interconnection (POI) is the Groton 115kV substation.

Generated from interconnection queue and public data sources

Project Details

State

SD

County

Brown

Grid Region

Mountain West

Market

Developer

Utility

WAPA/BEPC/HCPD Integrated System

Entity

WAPA-IS

Service Type

Point of Interconnection

Groton 115kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project WAPA-IS-GI-1505