Project WAPA-IS-GI-1509 — Project Summary

Queue ID
WAPA-IS-GI-1509
Capacity
150 MW
Technology
Wind
Status
active
Location
Stark, ND
Region
West
Developer
IA Status
In Progress (unknown study)

WAPA-IS-GI-1509

WAPA-IS-GI-1509BetaActiveWindWAPA-ISLBNL

150 MW generation in Stark, ND · In queue since September 2015

150 MW

Capacity

1

Components

Wind

10y 8m

In Queue

In Progress (unknown study)

IA Status

Interconnection

Total Duration

10y 8m

In Study38%
Queue EntrySep 30, 2015

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

WAPA-IS-GI-1509 is a proposed wind generation project with a total capacity of 150 MW. The project is located in Stark County, North Dakota, and interconnects to the WAPA/BEPC/HCPD Integrated System, specifically at the Belfield-Rhame 230kV point of interconnection. The project entered the WAPA-IS interconnection queue on September 30, 2015.

The interconnection agreement for WAPA-IS-GI-1509 is currently listed as "In Progress (unknown study)". The developer is unknown.

Generated from interconnection queue and public data sources

Project Details

State

ND

County

Stark

Grid Region

Mountain West

Market

Developer

Utility

WAPA/BEPC/HCPD Integrated System

Entity

WAPA-IS

Service Type

Point of Interconnection

Belfield-Rhame 230kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.