Project WAPA-MPP-2023-MP2 — Project Summary

Queue ID
WAPA-MPP-2023-MP2
Capacity
600 MW
Technology
Solar+Battery
Status
active
Location
Mohave, AZ
Region
West
Developer
IA Status

WAPA-MPP-2023-MP2

WAPA-MPP-2023-MP2BetaActiveSolarBatteryWAPA-MPPLBNL

600 MW hybrid in Mohave, AZ · In queue since March 2023 · Proposed COD June 2026

600 MW

Capacity

1

Components

Solar

3y 2m

In Queue

IA Status

COD target: 2026

Interconnection

Total Duration

3y 3m

Pre-Study0%
Queue EntryMar 23, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-06-23

About

WAPA-MPP-2023-MP2 is a proposed 600 MW hybrid solar and battery project located in Mohave County, Arizona. The project, which consists of 600 MW of solar capacity, is in the WAPA Desert Southwest Region interconnection queue (WAPA-MPP) with an entry date of March 23, 2023. The proposed commercial operation date is June 23, 2026.

The project is currently listed as active in the interconnection queue. The point of interconnection is the Mead-Perkins 500kV line.

Generated from interconnection queue and public data sources

Project Details

State

AZ

County

Mohave

Grid Region

Mountain West

Market

Developer

Utility

WAPA Desert Southwest Region

Entity

WAPA-MPP

Service Type

Point of Interconnection

Mead-Perkins 500kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
PALOVERDE
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.