WAPA-RM-2023-G5.1
400 MW hybrid in Coconino, AZ · In queue since March 2023 · Proposed COD December 2027
400 MW
Capacity
1
Components
Solar
3y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2027
Total Duration
4y 9m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-01
WAPA-RM-2023-G5.1 is a proposed 400 MW hybrid Solar and Battery project located in Coconino County, Arizona. The project is listed in the Western Area Power Administration - Rocky Mountain Region (WAPA-RM) interconnection queue, with an entry date of March 26, 2023, and a proposed commercial operation date of December 1, 2027. The interconnection agreement status is listed as "In Progress (unknown study)".
The proposed project consists of 400 MW of solar capacity. The point of interconnection is the Flagstaff - Pinnacle Peak 345-kV line. The listed utility is CRCM.
Generated from interconnection queue and public data sources
State
AZ
County
Coconino
Grid Region
Mountain West
Market
—
Developer
—
Utility
CRCM
Entity
WAPA-RM
Service Type
—
Point of Interconnection
Flagstaff - Pinnacle Peak 345-kV
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- PALOVERDE
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.