Search plants, projects, owners, and states
350 MW Solar under construction in Jones, TX — Electric Reliability Council of Texas, Inc.
350 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
Coordinates
32.7837, -99.7202
County
Jones, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Funston Solar, LLC | — | — |
| Owner(s) | Funston Solar, LLC | — | — |
| Status | Under construction | announced | — |
Funston Solar is a 350 MW solar photovoltaic power plant located in Jones County, Texas. The plant, identified by plant code 67359, is owned and operated by Funston Solar, LLC. It utilizes fixed-tilt solar tracking technology. Funston Solar ranks as the 30th largest solar plant in Texas out of 192, and 57th nationally out of 639.
The plant connects to the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority, within the TRE NERC region. It has one generator. The primary fuel source for the plant is solar energy (SUN).
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
No generation data available for this plant.
2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $540.0M
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
Plant coordinates only
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
—
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Top 10 solar states
Data tables and metrics from the powerplantsinfo.org database.