200 MW BESS planned in Howard, TX — Electric Reliability Council of Texas, Inc.
200 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
Planned: —
Planned Operation
Coordinates
32.2727, -101.5112
County
Howard, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cypress Creek Renewables | — | — |
| Owner(s) | Cypress Creek Renewables | — | — |
| Status | Planned | — | — |
Wallie Storage is a 200 MW battery energy storage system located in Howard County, Texas. The plant's primary fuel is electricity (MWH), indicating it charges from the grid. It consists of a single generator. Cypress Creek Renewables operates the facility.
The plant is located within the Electric Reliability Council of Texas (ERCOT) balancing authority, and the NERC region TRE. Wallie Storage ranks as the 113th largest power plant in Texas out of 224, and 288th nationally out of 514.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
No generation data available for this plant.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $272.2M
Point of Interconnection
Nearest Substation
Big Spring West Substation · 138 kV
Substation Distance
< 10 km
Operator
Oncor
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_WEST
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP