250 MW BESS planned in Hardeman, TX — Electric Reliability Council of Texas, Inc.
250 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
Planned: —
Planned Operation
Coordinates
34.2655, -99.8721
County
Hardeman, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Lazy U ESS 1 LLC | — | — |
| Owner(s) | Lazy U ESS 1 LLC | — | — |
| Status | Planned | — | — |
Lazy U ESS 1 is a 250 MW battery energy storage system located in Hardeman County, Texas. The plant is owned and operated by Lazy U ESS 1 LLC. It interconnects to the Electric Reliability Council of Texas (ERCOT) grid, within the Texas Reliability Entity (TRE) NERC region.
The facility consists of a single generator and utilizes megawatt-hours (MWH) as its primary fuel source, indicating it draws power from the grid to charge its batteries. Lazy U ESS 1 ranks as the 67th largest power plant in Texas out of 224, and 202nd nationally out of 514 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
No generation data available for this plant.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $340.3M
Point of Interconnection
Nearest Substation
Quanah Acme Mills Substation · 69 kV
Substation Distance
< 10 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP