Padua 3 is a 200 MW battery energy storage system located in Bexar County, Texas. The plant, identified by the EIA plant code 68914, is owned and operated by Padua 3. It consists of a single generator utilizing batteries as its primary technology and MWH as its fuel source.
The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. Padua 3 is ranked as the 116th largest power plant in Texas out of 224, and nationally it holds a rank of 296 out of 514 facilities. News coverage related to the plant includes 6 articles about deals, 1 about the grid, and 1 about the industry.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
No generation data available for this plant.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $272.2M
Market Position
ISO/RTO Market
ERCOT
LMP Node
RN_PAD3_ESS
Pricing Hub
HB_SOUTH
Location Type
Resource Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP